Project Profile:

Due to the erosion that has occurred along the banks of the storm outfall and its impact on the bridge structure, the City of Camrose proposes to perform repairs to make the walkway safer for maintenance equipment.

The repair will entail removing the bridge that spans the outfall and installing erosion protective gabion baskets with large diameter rock material placed inside to dissipate the energy generated by the water when it exits the storm system.

The bridge foundation will need maintenance repairs to prolong the life of the structure.

Engineering:

The design and site supervision of this project will be conducted by the City Engineering Department and Focus Corporation.

Contractor:

Project to be undertaken by the City Public Works Department.

Budget and Funding:

This project is estimated to cost $20,000.

Schedule:

This project was completed by the end of October.

Photos:

October 18 - Deck removed. October 18 - Preparation for gabion installation.
October 19 - Gabion installation. October 19 - Steel pipes installed.
October 25 - Installation complete. October 25 - Installation complete.

Public Notice:

For more information contact the Engineering Department at 672-4428.

  Home  Search  Index  Feedback  Privacy and Condition of Use StatementWe welcome your feedback
Updated October 29, 2007

Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose

Copyright and Disclaimer | Conditions of Use and Privacy Statement