![]() |
Grand Drive Outfall UpgradeLast Modified Dec 12, 06Project Profile: Due to the erosion that has occurred along the banks of the storm outfall and its impact on the bridge structure, the City of Camrose proposes to perform repairs to make the walkway safer for maintenance equipment. The repair will entail removing the bridge that spans the outfall and installing erosion protective gabion baskets with large diameter rock material placed inside to dissipate the energy generated by the water when it exits the storm system. The bridge foundation will need maintenance repairs to prolong the life of the structure.
Engineering: The design and site supervision of this project will be conducted by the City Engineering Department and GPEC Consulting Ltd.. Contractor: Project to be undertaken by the City Public Works Department. Budget and Funding: This project is estimated to cost $20,000. Schedule: This project has been postponed until 2007. Public Notice: For more information contact the Engineering Department at 672-4428. |
Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose
Copyright and Disclaimer | Conditions of Use and Privacy Statement