Project Profile:
The sewer re-lining project along 47 Avenue between 50 Street to west of 52 Street is a non-disruptive method of installing a fully
structural pipe within a pipe. The lining technique utilizes the existing pipe and involves inserting a liner made up of fiberglass, inflated with a resin that once
cured will form a wall inside the deteriorated pipe. Minimal excavation of the existing road surface is required lowering the cost of the project and
causing less disruption to the neighbourhood.
Engineering:
The design and site supervision of this project will be conducted by the City Engineering
Department.
Contractor:
To be determined.
Budget and Funding:
This project is estimated to cost $80,000.
Schedule:
This project has been postponed until 2007.
Public Notice:
For more information contact the Engineering Department at 672-4428.
|