47 Avenue Sanitary Sewer Relining
50 Street to West of 52 Street

Last Modified Oct 10, 06

Project Profile:

The sewer re-lining project along 47 Avenue between 50 Street to west of 52 Street is a non-disruptive method of installing a fully structural pipe within a pipe. The lining technique utilizes the existing pipe and involves inserting a liner made up of fiberglass, inflated with a resin that once cured will form a wall inside the deteriorated pipe. Minimal excavation of the existing road surface is required lowering the cost of the project and causing less disruption to the neighbourhood.

Engineering:

The design and site supervision of this project will be conducted by the City Engineering Department.

Contractor:

To be determined.

Budget and Funding:

This project is estimated to cost $80,000.

Schedule:

This project has been postponed until 2007.

Public Notice:

For more information contact the Engineering Department at 672-4428.

  Home  Search  Index  Feedback  Privacy and Condition of Use StatementWe welcome your feedback
Updated October 10, 2006

Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose

Copyright and Disclaimer | Conditions of Use and Privacy Statement