48 Avenue

47 Street to 50 Street

Last Modified November 17, 2005

Partially Funded by:

Alberta Transportation logo

Project Profile:

This project is the latest in a series of designed improvements scheduled for 48th Avenue. The work involves the realignment / widening of 48th Avenue along the north side of this roadway, allowing for lane widths to increase to the modern standard. The curb and gutter will be replaced throughout the project, which will introduce minor grade changes to improve drainage along the roadway. Newer, wider sidewalks will be constructed on both the North and South sides of 48 Avenue to improve pedestrian comfort, safety and accessibility. Asphalt failures on sections of roadway and drainage issues will also be addressed as part of the scope of project.

For these blocks of 48th Avenue, traffic will be reduced to one lane in each direction for the entire duration of the project which is expected to take up to 4 weeks. Traffic signal pole upgrades will accompany the intersection modifications as well signal head changes to the new LED style.

Engineering:

The design and site supervision of this project will be conducted by the City Engineering Department with assistance from Traffic Solutions Consulting Ltd.

Contractor:

Joe's Concrete has been awarded the concrete contract. EPCOR was awarded the traffic signal intersection contract. Border Paving Ltd. has been awarded the paving contract.

Budget and Funding:

The total project budget is $600,000 with funding from City current revenue and provincial grants.

Schedule:

This project was completed by early November.

Photos:

Relocation of traffic control devices taking place.Excavation of existing medians has taken place.
Excavation of existing road and sidewalk to accomodate widening.Forming of new concrete sidewalk.
Excavation of old curb, gutter and sidewalk to
complete concrete work on south side.
Pouring of new concrete medians.
Road oiled in preparation for paving.Placing of top lift asphalt.

Public Notice:

For More Information Contact the Engineering Department at 672-4428.

  Home  Search  Index  Feedback  Privacy and Condition of Use StatementWe welcome your feedback
Updated November 17, 2005