![]() |
Project Profile: This is a continuation of the 2003 project on 68 Street that brought a 2.5 meter wide asphalt walkway from 48 Avenue south to Enevold Drive. This walkway will complete the link for pedestrians and cyclists in the south & west ends of Camrose to the west end highway commercial areas. The 2004 project will extend the trail south from Enevold Drive, on the berm, and east to Parkview Drive where it will connect to the existing walkway on the east side of Parkview Drive. The City will provide notice of the upcoming work in an effort to minimize the impact to area residents. ![]() Engineering: The design and site supervision of this project will be conducted by the City Engineering Department. Contractor: Border Paving Ltd. was awarded the contract for this project. Budget and Funding: The 2004 component of the trail extension is estimated to cost $206,000.00 with approximately 1/2 paid by transportation levy and the other 1/2 by the City land fund and reserve fund. Schedule: Paving and concrete work was completed by the end of May. Photos:
Public Notice: For More Information Contact the Engineering Department at 672-4428. |
Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose
Copyright and Disclaimer | Conditions of Use and Privacy Statement