Project Profile: A 2.5 metre wide asphalt walkway will be constructed on the west side of 68th Street from a point south of Enevold Drive to 48th Avenue. This walkway will provide a vital link for pedestrians and cyclists to the Duggan Mall and to the west end highway commercial areas. ![]() Engineering: The design and site supervision of this project will be conducted by the City Engineering Department. Contractor: Border Paving Ltd. and Branco Concrete were awarded the contracts for this project. Budget and Funding:
Schedule: Trail completed to Enevold Drive (excluding tie-in to existing sidewalk). Continuation to Parkview Drive expected in summer of 2004. Photos:
Public Notice: For More Information Contact the Engineering Department at 672-4428. |