Partially Funded by: Project Profile: This project is the last of a multi-phased roadway reconstruction program in this area. The road construction project involves the excavation of the existing road base and backfill with road base gravel followed by the concrete work and asphalt paving. Existing lanes will provide an alternative access to homes in the area. The City will host an open house for residents on 58 Street in the spring of 2003 to discuss the local improvement costs, project schedule and get input from property owners about existing problems such as drainage, access issues during construction etc. Adjacent roadways and lane will provide an alternative access to homes in the area. ![]() Engineering: The design and site supervision of this project will be conducted by the City Engineering Department. Contractor: The contractors for this project have yet to be determined. Budget and Funding:
Schedule: Cancelled due to valid oppposition from area residents. Public Notice: For More Information Contact the Engineering Department at 672-4428. |
Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose
Copyright and Disclaimer | Conditions of Use and Privacy Statement